Interesting installation for GAS water heater vent.
Joints are taped with improper material and the vent pipe should always RISE minimum of ¼” per foot, NOT, downhill!
The structural posts in the crawl space are leaning, one already fell.
THIS IS THE MAIN HOUSE BEAM SUPPORT!